Step-by-step installation instructions for all SPACE® FRP sheet series — Sun-Lite, Moon-Lite, and Star-Lite.
PDF · Updated 2017 · ~3 MB
Download GuideNo sign-up required — instant download
Structural check, purlin alignment, tool requirements, and weather conditions
Correct blade types, hole sizing for thermal movement, edge sealing
Minimum 10% slope, ridge-to-gutter method, end lap guidelines
Corrosion-resistant fasteners, EPDM washers, torque settings
Silicone sealant application, butyl tape, ridge flashings, counter flashings
PPE requirements, fall protection, handling procedures, site safety
| Parameter | Recommended Value | Notes |
|---|---|---|
| Minimum Roof Slope | 10% (approx. 6°) | Ridge-to-gutter installation preferred |
| Purlin Spacing (max) | 1,200mm | Subject to wind zone — check with engineer |
| End Lap | 150mm minimum | 200mm recommended for low-pitch roofs |
| Side Lap | 1.5 corrugations minimum | Full corrugation recommended |
| Thermal Movement Allowance | 3mm per metre | Oversize holes for fasteners |
| Fastener Pitch (end) | 300mm | Every corrugation at end spans |
| Fastener Pitch (internal) | 450–600mm | Every 2nd–3rd corrugation |
| Thread Engagement | Minimum 50mm | Into structural purlin |